New guests, onboarded in two hours instead of three days
A UAE pet daycare and boarding company’s intake - vaccination certs, vet records, behavioural assessments - delegated to an onboarding harness with approval gates.
Pet Care & Services
Published 2 September 2026 · Updated 12 November 2026 · By Tom Sowerby, Co-Founder
- Onboarding time
- 3 days to 2 hours
- Measured - booking-system timestamps, enquiry to check-in-ready, first 90 days after launch
- Process cost saved
- ~$200K/year
- Across intake, compliance and follow-up
My Second Home Dubai runs a pet hotel. Daycare and boarding for expat families who travel a lot - dogs and cats, a fleet of transfer vans crossing the UAE every day, and guests whose owners send their own beds and toys and leave a training brief: work on the leash reactivity while we’re away.
That's the service. The intake behind it was three days of email.
The process before
A new guest arrived by web form or WhatsApp. The coordinator sent the list - vaccination certificates, vet records, a behavioural questionnaire - and waited. Documents trickled in across days, scattered across inboxes. Each one was re-keyed into the booking system by hand. The behavioural assessment got scheduled by chasing. The room brief - which bed, which toys, what to work on - lived in whoever’s notes.
Three days of elapsed time, most of it waiting on a human to pick up the next step. And the failure mode was discovery at the door: a lapsed vaccination certificate found at check-in, with the van already on its way.
What was built
An onboarding harness owns intake. A harness is a managed system of agents and integrations that runs a business process end to end, with humans at the consequential steps. It reads the enquiry, assembles the document list per animal, verifies certificates at entry, drafts the behavioural brief, schedules the assessment, and generates the room setup notes from the client’s own preferences.
A human approves anything consequential - accepting a booking with a behavioural flag, an incomplete record, an exception to policy. Nothing leaves the system unreviewed.
Validation came first. A booking created from an unverified document would put the error into the schedule and the room plan - a lapsed certificate, a missing assessment, propagating through every downstream record. Documents are checked at entry, before any booking exists.
Every engagement on this page started the same way: a ranked list of which work was worth delegating, validated against the systems the client actually runs. The Agentic Opportunity Audit produces that list - fixed at $7,500, credited in full toward a build within 60 days. See what it would look like in your operations.
What changed
Onboarding dropped from three elapsed days to roughly two working hours - measured on booking-system timestamps from enquiry to check-in-ready. Coordinators stopped chasing paperwork and started handling the exceptions: first-time guests, behavioural flags, incomplete records. The follow-up sequence, previously the first thing dropped when the team got busy, now runs on its own.
Across intake, compliance and follow-up, that’s about $200K a year of coordinator time back.
Frequently Asked Questions
- Was any client data used to train the model?
- No. The harness reads client documents to complete the process, but nothing trains a model on it, and data is kept onshore wherever possible. Every access is logged in the audit trail.
- What happens when the harness isn’t sure?
- It stops and escalates to a human through an approval gate. The odd cases - animals with behavioural flags, incomplete records, first-time guests - are exactly the cases it is tuned to hand over rather than guess at.
- Who owns the system now?
- It runs under Harness Management: a named owner, monitoring, and drift caught before clients feel it. The client holds the source code.
Not sure which work to delegate first? Start with 30 minutes.
A free conversation where we learn how your business runs and where the work goes. If an audit is the right next step, it's $7,500 fixed, takes two weeks, and is credited in full toward a build commissioned within 60 days. No pitch, no pressure.